欧美一区-欧美一区2区三区4区公司-欧美一区2区三区4区公司贰佰-欧美一区不卡黄色网站在线观看-欧美一区二区-欧美一区二区成人片在线


DDDL-500-100Three phase voltage and current source
  • Product name: DDDL-500-100Three phase voltage and current source

  • Product model: DDDL-500-100

  • Release time: 2018-07-19 10:45:19

  • Manufacturer: Great electric equipment Co., Ltd.



功能描述

DDDL-500/100 three-phase voltage and current source is a test product developed by our company. It combines the advantages of similar products at home and abroad, uses numerical control technology, has strong anti-interference ability, and is compared with the previous generation of current current. Because of the use of low power, large capacity autotransformer and high guide magnet core converter, The utility model has the advantages of large power, small volume and light weight. It is mainly used for thermal relays, motor protectors, contactors, circuit breakers, air switches, switchgear, protective screen calibration.

 

major function

A long time output of 0 ~ 100A*3 current

0 ~ 5000V*3 voltage can be output for a long time

At the same time, it can connect several serial checks to improve efficiency.

儀器特點

A beautiful and generous PVC panel

High measurement precision

High power, small volume, and strong load capacity

Small size, light weight, only 30% to 70% of the volume of similar products.

Operational aspects

(1) after the connection is completed, check it again to see if there is any wiring error and whether the connector is in good contact.

(2) during the testing process, if there is fire, and no indication is displayed when starting, the power supply should be shut down immediately.

Check connection

(3) in actual wiring, the current output terminal should form a loop, otherwise there will be no current output.

This lift is equipped with a random output wire and the output copper wire is selected according to 10A/mm2.

(5) the capacity of the equipment is designed according to the 5 minute short time operation, for example, the batch test should be less than 2.5 minutes.

Clock, wait for 10 minutes, then do the next work. If the temperature rise (30 minutes -24 hours) should be according to length

Time work temperature rise configuration


技術參數

1. names and classifications

(1) Name: three phase voltage and current source.

(2) environmental group: the III group instrument in the GB6587.1-86 environmental test general specification for electronic measuring instruments (can be used in outdoor environment).

(3) input AC 380V three-phase four wire, 50HZ

(4) output 0-100A three-phase AC current: the 0-500v three-phase AC voltage output current is the standard sine wave, the burr is small, it is better than the standard of the power system requirements, the ripple coefficient is less than 0.3%

(5) output current mode: the RMS is adjustable continuously.

(6) output waveform: standard sine wave

(7) the opening voltage of the output of the current end is more than 3V

(8) precision: the current and voltage can be smooth and continuous adjustment, the precision is higher than level 0.5, the voltage ammeter shows true value, high precision, high stability

(9) current stability: 0.2%

(10) distortion of current waveform: THD1%

(11) power: 1000VA*3

 

Three operation description

 

1. before the power supply is connected, the power switch should be disconnected first, and all the handles are turned back to zero position counterclockwise.

2. the power input terminal is connected with the AC380V three-phase four wire voltage, and then the sample is connected to the corresponding voltage and the current output terminal.

3. after the connection is completed, close the "power switch" and press the "start" button to adjust the corresponding current and voltage in a clockwise manner. After the end of the experiment, press the "stop" button.

 

Four safety precautions

1, in order to ensure the safety of operators and instruments, ensure good grounding.

 

2, when the experiment is ready, it is best to connect the ground wire first, and finally, when the work is finished, remove the ground wire.

 

3, the power supply of the access instrument can withstand the current impact of 45A.

 

4, when the instrument is connected with the test product, check whether the wiring is wrong, so as not to cause equipment damage due to wiring errors.

 

5, the maximum current value of the over-current protection should not exceed the rated output current value of the instrument.

6, no connection can be inserted in the case of power on.

 

Eight transportation and maintenance

1. transport:

The product must be packed during transportation. The packing box should be wooden box, and foam proof layer should be used in the packing box. Packaged products should not be placed in open-air garage during road, railway and air transportation. The storehouse should pay attention to rain protection, dust prevention and mechanical damage.

2. storage:

The instrument should be stored in an environment of -40 to 60 degrees centigrade with a relative humidity of not more than 85%, ventilated and corrosive free.

It should not be placed only on the ground and walls.

3. dust prevention:

In humid areas or in wet seasons, this instrument is required to open electricity once a month (about two hours) to protect the electronic components, if it is not used for a long time.

 

4 insolation

When the instrument is used outdoors, avoid or reduce the direct exposure of sunlight to the screen as far as possible.

Library.

Nine random appendage

A set of 1. power lines

2 a copy of the instructions

3 Certificate of qualification

One copy of 4 warranty card

 

Ten quality assurance and after-sales service

1, the instrument is manufactured in strict accordance with national standards and enterprise standards. The IS09000 standard is strictly enforced in the production process to ensure the quality of the instrument.

2, the instrument will have a shelf life of one year. During this period, the quality of the instrument is lower than the requirements due to manufacturing reasons. The company will maintain it free of charge.

3, the instrument has three packages.

4, in the service life of the instrument, the company will provide maintenance, training, accessories and other related services.

5, if the problem is found in the use, please contact our company in a timely manner. We will take different ways according to different circumstances: door-to-door maintenance guidance or return factory maintenance

主站蜘蛛池模板: 欧美日韩国产在线 | 欧洲精品久久久久69精品 | 色婷婷综合久久久久国产精品中文 | 18禁午夜 | 中文字幕av久久 | 国产精品美女一区二 | 国产乱子伦视频在线观看 | 日韩精品不卡一区二区三区四区 | 一级做a爰片性色毛片成人久久久国产 | 国产成人无码区免费aⅴ片老人 | 日本妇乱子伦视频免费的 | 无码日韩人妻av一区二区三 | 亚洲精品自偷自拍无码忘 | 国产激情电影综合在线看 | 狠狠色综合久久丁香婷婷 | 91久久亚洲综合精品国产 | 加勒比色综合久久久久久久久 | 亚洲国产成人片在线 | 中文字幕无码免费久久 | 青青鲁久久久一区 | 午夜精品亚洲国产av | 日韩欧美一区二区三区不卡在 | 国产精品亚洲а∨无码播放麻豆 | 精品无码写真永久福利 | 91久久久久国产一区二区 | 免费观看又污又黄在线观看 | 一级毛片在线看在线播放 | 精品无码国产av一区二区 | 欧美丰满 | 国产三级2025在线观看 | 国产精品三级手机在线观看 | 中文字幕人成无码免费视频 | 亚洲无码av漏毛 | 麻豆国产免费黄网站在线观看 | 一区二区三区四区精品视频在线观看 | 日韩欧无码一区二区三区免费不卡 | 国产精品无码不卡一区二区三区 | 国产福利av在线播放 | 日本精品成人一区二区三区视频 | 日本高清免费一级啪啪大片 | 日韩国产不卡一区二区三区 |